Welcome to DU! The truly grassroots left-of-center political community where regular people, not algorithms, drive the discussions and set the standards. Join the community: Create a free account Support DU (and get rid of ads!): Become a Star Member Latest Breaking News Editorials & Other Articles General Discussion The DU Lounge All Forums Issue Forums Culture Forums Alliance Forums Region Forums Support Forums Help & Search

National Security & Defense

Showing Original Post only (View all)

nitpicker

(7,153 posts)
Mon May 13, 2019, 03:43 AM May 2019

Major Problems Persist With JLTV, Zumwalt Destroyer, GAO Finds [View all]

https://www.military.com/daily-news/2019/05/10/major-problems-persist-jltv-zumwalt-destroyer-gao-finds.html

Major Problems Persist With JLTV, Zumwalt Destroyer, GAO Finds

10 May 2019

Military.com | By Richard Sisk

The Pentagon's purchase of $1.69 trillion worth of major weapons systems has been riddled by cost overruns, delays and other problems reflecting poor oversight, the Government Accountability Office said in its annual survey of Defense Department acquisitions. The 229-page report subtitled "Limited Use of Knowledge-Based Practices Continues to Undercut DOD's Investments" recommended that the DoD do a better job of checking out the design for a weapons system and what it's supposed to do before buying it.

"Completion of a preliminary design review prior to starting development" would be advisable, the GAO said in its 17th annual survey of defense acquisitions, released Tuesday. "This lack of knowledge and the effects it can have throughout a program's acquisition life cycle can increase the risk of undesirable cost and schedule outcomes."

The report included breakouts on 51 of the 82 major weapons systems examined, including the F-35 Joint Strike Fighter, Zumwalt-class stealthy destroyer, Joint Light Tactical Vehicle (JLTV) and KC-46 aerial refueling tanker.

The GAO said that the DoD's program office for the F-35 is continuing "to address over 900 deficiencies identified with the aircraft's performance prior to the end of development testing." The report cited as an example the development of "a new helmet mounted display, which will resolve an existing green glow effect that can distort a pilot's vision during night time carrier landings. Program officials expect installation of some of the new displays in 2019."

The Navy is still trying to figure out what to do about the two 155mm deck guns that had been planned for the three Zumwalt-class destroyers, the GAO report said. In development, the Navy found that the cost for a single round for the guns was roughly $800,000. "Following an evaluation of five other munition options, the Navy determined that no viable replacement, guided or unguided, was feasible," the report said. "As a result, the guns will remain inoperable on the ships for the foreseeable future."

In January 2018, the Navy changed the primary mission for the Zumwalt class from land attack to offensive surface strike. "According to Navy officials, the Navy's planned modifications to support the new mission will cost about $1 billion," the report said.

On JLTV, "the Army and Marine Corps recently concluded operational testing for JLTV and found the vehicles to be survivable for the crew and effective for small combat and transport missions," the GAO report said.

However, the services also concluded that that the JLTVs were "not operationally suitable because of their high maintenance needs, low reliability, training and manual deficiencies, and safety shortcomings," the report said.
(snip)
4 replies = new reply since forum marked as read
Highlight: NoneDon't highlight anything 5 newestHighlight 5 most recent replies
Latest Discussions»Issue Forums»National Security & Defense»Major Problems Persist Wi...»Reply #0